Camp Tuckahoe Construction Photos
May 7, 2003

Click on any of the thumbnails to see a full-size version of the photograph. 

Dining Hall Moving Right Along

Over the past three weeks, a great deal has been accomplished at the dining hall. The roof has been shingled, and the exterior siding and windows have been installed.

Ready and Waiting For Summer Camp

The walk-in refrigeration and freezer units are now in place in the new dining hall.

A View from the Campmaster's Lodge

Here's a view of the dining hall from the intersection at the campmaster's lodge. The fireplace is spectacular. A covered porch has yet to be created to wrap around the building.

Old West Revisited

Construction on the fort is in the home stretch.

Medieval Times

The castle is an imposing first impression for anyone entering the Cub World.

Pool Progress

The pool contractor has now installed coping and tile to the top edge of the pool shell and is nearly ready to apply the final finish.

Bath House Fixture Installation

Plumbers are installing various fixtures inside the bath house. Here sinks have been installed in the Scout's shower room.

Final Piping Connections

The pool contractor works to make the final connections to pipe water to and from the filtration area.