Camp Tuckahoe Construction Photos
May 21, 2003

Click on any of the thumbnails to see a full-size version of the photograph.

Pool Deck Installation Begins

The installation of the concrete deck around the perimeter of the pool is now underway.

Bath House and Steps To Pool

Workers begin installing forms for the concrete to be poured to create the steps down to the pool from the bath house.

Dining Hall Assumes Final Profile

With the creation of its front and side porches, the dining hall exterior is nearing completion.

Dining Hall Stone Work is Awesome

Decorative stone work in the front of the new dining hall makes a dramatic statement.

Dining Hall Side Porch

Viewed from the road near the Camp Master Cabin, it is easy to appreciate the porch that wraps around from the front of the dining hall to its side.

Dining Hall Fireplace

With the installation of the hearth, only the mantel remains to be installed before the fireplace is complete.

New Dining Hall Benches

A mountain of new benches are being assembled and stored in the Historic Dining Hall before being delivered to their home in the new dining hall.

Castle Deck Takes Shape

Carpenters work to create the elevated deck for the castle in the Cub World.

Frontier Fort Is Impressive

Only the final touches remain to be completed on the Cub World's frontier fort before it is ready to greet Cub Scouts for the summer.